Non-Compliance detail


  
Summary
 
Licence number: 4848
Annual Return Start: 17 Aug 2015
Annual Return End: 16 Aug 2016
Date Received: 13 Oct 2016
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L3.1 Point 68 NOx emissions from the combined burn facility exceeded the licence limit due to a build-up of NOx in the chamber following shutdown and these were subsequently released as a block during operation the following shift. EPA to monitor future compliance with this condition 2
L3.1 Point 5 NOx emissions from the calcium nitrate reaction vessel exceeded the licence limit of 2000mg/m3 due to elevated reaction vessel temperatures. Additional controls have been installed to manage the emissions. EPA to monitor future compliance with this condition 1
L3.1 Point 2 Effluent discharged to the Murray River exceeded the suspended solids limit following a period of extended rainfall. EPA to monitor future compliance with this condition 1